EPD review
EPD pre-submission audit and LCA critical review
Environmental Product Declarations are increasingly required for procurement qualification, green building certification, and industrial supplier qualification.
If your organization has prepared an EPD supported by a Life Cycle Assessment study, DEISO provides independent technical pre-submission EPD audit and LCA critical review to strengthen conformity, methodological integrity, and disclosure credibility before submission to an authorized program operator.
To preserve independence, DEISO does not act as an EPD program operator or formal third-party verifier. Our role is limited to independent technical audit and review before submission for official verification.
Scope
Scope of EPD pre-submission audit services
Our engagements support both single-product and portfolio-level EPDs across industrial sectors.
- ISO 14025 alignment assessment
- PCR conformity evaluation
- Life Cycle Assessment consistency review
- Indicator accuracy and completeness checks
- Boundary and allocation validation
- Multi-product EPD documentation audit
Engagements may apply to new EPD drafts, renewals, or revisions before formal submission.
Service one
EPD pre-submission audit
The pre-submission audit is built to identify gaps, inconsistencies, and non-conformities before the EPD is submitted to a program operator for official verification.
This service is appropriate when:
- Preparing an EPD for third-party verification
- Seeking to minimize rejection or corrective cycles
- Strengthening documentation before program operator review
- Improving confidence in PCR alignment
Audit procedures may include
- Declared unit and functional unit assessment
- Boundary consistency evaluation
- Allocation methodology review
- Impact category consistency checks
- Cross-checking LCA outputs and supporting documentation
- PCR conformity gap analysis
- Technical audit report with corrective action recommendations
Service two
LCA critical review (ISO 14040 / 14044)
An LCA critical review evaluates whether the Life Cycle Assessment supporting the EPD conforms to ISO 14040 and ISO 14044 methodological requirements.
This is particularly recommended when:
- Supporting comparative environmental claims
- Managing high-risk public disclosures
- Confirming methodological defensibility before EPD publication
Critical review procedures may include
- Goal and scope definition consistency review
- Inventory data appropriateness assessment
- Impact assessment methodology validation
- Interpretation logic evaluation
- Documentation transparency analysis
- Independent critical review opinion
Comparison
Pre-submission audit versus LCA critical review
The pre-submission audit focuses on declaration completeness and PCR conformity before official verification, while the LCA critical review evaluates the methodological defensibility of the underlying Life Cycle Assessment.
Placeholder
EPD comparison table block goes here.
Engagement process
How an EPD review engagement runs
1
Scope confirmation
- Applicable PCR identification
- Product system boundary definition
- LCA documentation review
- Evidence and data quality assessment
2
Technical audit or critical review execution
Structured audit or review procedures aligned with the selected engagement type.
3
Independent technical conclusion
- Technical audit report or critical review opinion
- Identified gaps and corrective recommendations
- Pre-submission readiness guidance
Why DEISO
Why organizations choose DEISO
- Industrial-sector specialization
- Advanced LCA and carbon accounting expertise
- Structured audit methodology
- Risk-aware technical assessment
- Independent, technically grounded review
We operate with discipline, documentation rigor, and governance sensitivity.
Next step
Request an EPD pre-submission audit scope assessment
If your Environmental Product Declaration and supporting LCA are prepared and ready for independent technical review before official verification, a structured scoping exchange will determine:
- Appropriate engagement type
- PCR and methodological alignment requirements
- Engagement structure and timeline